Electrical Contractors
Switchgear, switchboards, transformers, UPS and battery systems, PDUs, busway, cable tray, and conduit racks, delivered as one package for the submittal.
Electrical and mechanical scopePE-stamped anchorage and bracing calculations for switchgear, UPS and battery systems, generators, busway, cable tray, cooling equipment, and prefabricated skids. Prepared for the contractor holding the Division 26 or 23 seismic section, to the 2025 California Building Code and ASCE 7-22 Chapter 13.

Seismic control sections such as 26 05 48 and 23 05 48 assign anchorage and bracing design to the trade contractor, sealed by a registered professional engineer. That is the engagement we are set up for.
Switchgear, switchboards, transformers, UPS and battery systems, PDUs, busway, cable tray, and conduit racks, delivered as one package for the submittal.
Electrical and mechanical scopeCooling units, coolant distribution units, chillers, pumps, piping supports, and rooftop equipment on curbs or dunnage frames.
Electrical and mechanical scopeProject-specific anchorage of power skids, modular electrical enclosures, and packaged cooling skids to their pads.
Skid and equipment scopeIndependent review of delegated seismic submittals prepared by others, against the project criteria and ASCE 7-22 Chapter 13.
Bracing and anchor manufacturers provide layouts and calculations for their own hardware. They generally do not take responsibility for the structure the bracing attaches to, or for anchoring floor-mounted equipment.
Switchgear, UPS, battery racks, transformers, and generators anchored to slabs and housekeeping pads, with anchors designed to ACI 318-19 Chapter 17 using ICC-ES evaluated products.
Checks of the slab, deck, or steel framing that hangers, braces, and equipment supports attach to, so the load path is closed, not assumed.
Strut frames, equipment stands, platforms, and dunnage designed as equipment supports under ASCE 7-22 Chapter 13.
One calculation package across several vendors’ equipment, plus responses to engineer-of-record comments and resubmittals.
Every package states its design basis up front so the reviewer does not have to reconstruct it.
Component forces per ASCE 7-22 Chapter 13, including the height amplification, structure ductility, component resonance, and component strength factors introduced in that edition.
Code minimum or owner criteria, whichever governs the project. The basis is written into the calculations, not left to interpretation.
ACI 318-19 Chapter 17 anchor design with ICC-ES evaluated anchors, with embedment, edge distance, spacing, and installation notes on the details.
Active equipment that must stay operable relies on the manufacturer’s AC156 or experience-data certificate. We design the anchorage to match it.
The request that moves fastest includes the equipment schedule, cut sheets, the spec section, and the structural drawings.
Equipment schedule, manufacturer cut sheets with mounting details, the seismic specification section, structural drawings, and any manufacturer seismic certificates.
A fixed scope listing each engineered item, the design basis, what is excluded, and the fee. No hourly billing on the base scope.
Component demands, anchor design, brace and support design where in scope, anchorage details, and an anchor schedule, assembled as a PE-stamped, submittal-ready PDF.
Responses to engineer-of-record and reviewer comments, resubmittals, and field questions during installation.
Calculations are prepared and stamped by Hamed Hasani, PhD, PE, a California-licensed civil engineer. He previously worked as a research and development engineer at Simpson Strong-Tie, and his doctoral research was in the seismic behavior of structures.
He also brings field experience from public infrastructure construction, which shapes how details are drawn: anchors that can be installed with the rebar and conduit actually in the pad, brace points that exist in the field, and details an inspector can verify.
Under the California Building Code most data centers are Risk Category II at code minimum. Many owners specify Risk Category IV, or a component importance factor Ip = 1.5 for equipment that must stay in service. We design to the governing project criteria and state the basis on the first page of the calculations, so the engineer of record and the plan reviewer see it immediately.
Not for active equipment that must remain operable after an earthquake. ASCE 7 requires that certification to come from the manufacturer, by shake-table testing (ICC-ES AC156) or experience data. We design the anchorage, supports, and attachments, and coordinate them with the manufacturer’s certificate.
Yes. Hamed Hasani is a California-licensed civil engineer, and California allows licensed civil engineers to perform this work on private projects. Some project specifications call for a structural engineer’s stamp by contract. We read the signer clause at scoping and tell you before any fee is committed.
Hospital projects under HCAI and public school projects under DSA require a California-licensed structural engineer under state law. We do not take those as engineer of record.
The equipment schedule with weights and center-of-gravity data, manufacturer cut sheets with mounting details, the seismic specification section, the structural drawings for the floor, pad, or framing the equipment attaches to, and any manufacturer seismic certificates.
Engineering is done from Dublin, California, with site visits across the San Francisco Bay Area. Projects elsewhere in California are taken by engagement.
Free 15-minute consultation, no obligation. You’ll get a written scope and fee estimate from a licensed California PE within one business day.