Engineering before formal acceptance is not reimbursable.
It does not disqualify the building. It is simply paid by the owner.
The California Residential Mitigation Program’s Earthquake Multi-Unit Retrofit (EMR) registration window ran August 19 to September 30, 2026, and has closed. If CRMP selected your building, the engineering has to follow CRMP’s sequence and finish fast enough to leave room for permit and construction. We produce the retrofit plans in 14 days and answer plan check without delay.
Written scope and fee within one business day.

Each is stated in CRMP’s program terms. Read them before you sign anything with a contractor.
It does not disqualify the building. It is simply paid by the owner.
This is the rule that costs owners the grant. No demolition, no mobilization, no pours.
A previously permitted and finaled line-only retrofit does not bar entry for the remaining ground-floor work.
Eligible cities.
These figures are published by CRMP and are CRMP’s incentive limits, not H2 Seismic Pro fees.
Source and current terms: crmp.org.
EMR requires a full ground-floor retrofit designed to FEMA P-807, IEBC Appendix Chapter A4 (latest edition), or ASCE 41 (latest edition). The same design must also satisfy your city’s mandatory ordinance, so we design once to the standard that satisfies both and state it on the cover sheet.
Retrofit drawings and calculations are stamped by a California PE. We submit to the city, answer two rounds of plan check corrections, and assemble the engineering documentation CRMP asks for.
Fixed fee, confirmed in writing before work begins. No hourly billing and no added charge for plan check responses.
Not included: construction, grant application or administration, city permit fees, and special inspection. After permit approval and CRMP construction approval, your contractor builds, the city performs final inspection, and you submit closeout documentation to CRMP.
Nine-month clock starts. Engagement signed so engineering invoices are dated after acceptance.
Ground floor measured and documented. Existing line or partial retrofits recorded.
Drawings and calculations complete and submitted to the city.
Two rounds included. Construction waits for permit and CRMP approval.
Engineering timing matters on an EMR project. Tell us when CRMP approved the building so we can plan inside the window.