H2 Seismic Pro
California PE · Bay Area and Los Angeles

PE-stamped reports and retrofit plans, on a deadline you can count on.

California seismic and structural engineering for ordinance compliance, inspections, forensic assessments, and new design. Each project has one responsible PE, from scope through site visit to stamp. Turnaround is stated in days.

PE-stamped work for owners, HOAs, contractors, and public agencies.

Written scope and fee within one business day.

Wood-framed elevated walkway between two multifamily residential buildings — the kind of structure routinely inspected and retrofitted by H2 Seismic Pro.
PE on site · San Francisco Bay Area
A licensed PE reviews every project and stamps the drawings; site visits are scoped to the project.
Two Ways We Work

Existing buildings, or something new.

Both tracks are PE-stamped and engineer-led. Pick the one that matches your project.

Existing Buildings

Evaluations, retrofit, and inspections.

Ordinance compliance, ASCE 41 evaluations, soft-story and non-ductile concrete retrofit, and SB-326 / SB-721 balcony inspections for buildings that already exist.

New Design & Additions

New construction, additions, and ADUs — permit-ready stamped structural.

Foundation, framing, and lateral design for work that does not exist yet. We design the structure directly or work from your architect’s plans.

All six practice areas
Why H2 Seismic Pro

An engineer's report, not a contractor's estimate.

01

Engineer-led, PE-stamped

One responsible PE per project, from design to stamp to RFI response.

02

Doctoral-level expertise

Doctoral-level seismic research anchors the practice. Judgment, not just code.

03

San Francisco Bay Area

Based in the San Francisco Bay Area. Statewide coverage from San Diego to Sacramento.

04

One business day

Written scope and fee within one business day. No black-box pricing.

Licensed & Affiliated
  • License California PE
    Civil / Structural
  • Member SEAOC
    Structural Engineers Assn. of CA
  • Member ASCE
    American Society of Civil Engineers
  • Member EERI
    Earthquake Engineering Research
  • Member ACI
    American Concrete Institute
  • Certified Small Business
    California DGS certified
Our Work

PE-stamped deliverables across California.

Client names withheld for confidentiality.

Soft-story garage retrofit in Los Angeles — steel moment frame with diagonal braces installed against plywood shear panels; LADBS-stamped plans on plywood table at right. Ord 183893
LA Ordinance 183893

Soft story retrofit

Multiple LA properties · structural bracing and cripple-wall reinforcement, PE-stamped and submitted to LADBS.

San Jose soft-story screening in progress — H2 Seismic Pro engineer in hard hat and high-vis vest documenting an open ground-floor parking level with second-story occupied units above. SJ Soft Story
San Jose Soft Story

Screening inspection

San Jose mandatory retrofit ordinance · PE-stamped screening report with findings and retrofit recommendations.

SB-326 / SB-721 balcony inspection in progress — engineer in high-vis vest using a moisture/density probe on the framing at an exposed exterior elevated element. SB-326 / 721
SB-326 / SB-721

Multifamily building

Northern California · PE-stamped balcony and elevated-element inspection, carrier accepted on first submission.

PE-stamped San Jose soft-story retrofit drawings — first-level framing plan with shear-wall elevation and typical hold-down detail. Property address and client name redacted. State of California PE seal visible at lower right. PE-Stamped
San Jose Soft Story

Retrofit plans · structural drawings

San Jose MSRO compliance · framing plan, shear-wall schedule, and typical hold-down details. PE-stamped and ready for City submittal.

In Their Words

What clients say after a project closes.

Names withheld for client confidentiality — role, asset type, and city verified.

“Our SB-326 inspection was overdue and the board wanted a real engineer, not a checklist vendor. H2 turned a stamped report inside two weeks, walked our board through the findings, and flagged two repairs we’d otherwise have missed.”
HOA Board President
84-unit condominium · Oakland, CA
“Fee proposal arrived the morning after we called. SB-721 inspections at three properties were scheduled, performed, and reported in the same calendar month. Carrier accepted the reports on the first submission.”
Property Manager
3-property apartment portfolio · San Jose, CA
“Brought in for a litigation-support structural assessment on a contested HOA matter. The report read like a deposition exhibit — clear scope, defensible methodology, and findings tied to specific code citations. Settled before trial.”
Real Estate Attorney
Plaintiff-side HOA litigation · Dublin, CA
Verified engagement
“We’ve worked with five structural firms across our Palisades rebuilds. H2 is the only one whose drawings cleared LADBS plan check on the first pass, every time.”
General Contractor · Principal
Wildfire rebuild GC · Pacific Palisades, CA
Service area Office in Dublin, CA. Site visits scheduled at engagement across the Bay Area and Los Angeles; statewide by engagement. Program pages: Los AngelesOaklandSan JoseSan Francisco
Featured compliance LAMC Division 95 · Ordinances 183893 / 184081

Non-ductile concrete buildings: The 10-year deadline is here.

If your building was constructed before 1977 and you received an Order to Comply from LADBS, the 10-year structural analysis and retrofit plans deadline is approaching — with most orders issued between 2016 and 2018. Engineering evaluation takes 4–6 months minimum. Owners who haven’t engaged a licensed PE are running out of time to meet the milestone without enforcement risk.

Compliance Timeline · Years 0–25
YEAR 0 Order to Comply YEAR 3 NDC Checklist YOU ARE HERE YEAR 10 Analysis + Plans Due YEAR 25 Construction Complete FINAL Cert. of Compliance
Engineering: 4–6 months · Construction: 5–15 years
~1,500
Buildings subject to LAMC Division 95 · Ordinances 183893 / 184081 in LA City alone.
<1%
Buildings with Certificate of Compliance as of the last public compliance report.
2026–28
Year 10 deadline window for most notified owners.
LA Wildfire Response

Wildfire rebuild structural engineering. Fixed fee for Palisades & Eaton.

PE-stamped structural drawings for Palisades and Eaton fire rebuilds. Fixed fee, confirmed in writing before work begins. Packages updated for the 2025 CBC and new California Wildland-Urban Interface Code, effective January 2026.

Standing home in an insurance dispute? Independent structural damage assessment

Pacific Palisades · Altadena · Malibu · Pasadena

Sheet S-2.1
CBC 2025
Get in Touch

Tell us about your project.

Free 15-minute consultation. Written scope and fee within one business day, from a licensed California PE.

Hours
Mon–Fri · 8:00am–5:00pm PT
Response
Within one business day

Written scope and fee within one business day. Fixed fee, confirmed in writing before work begins. No hourly billing and no added charge for plan check responses.

Response within 1 business day
Written scope and fee
Get a Written Scope and Fee