Oakland Soft Story Ordinance 13516.Every tier deadline has passed. PE-stamped evaluation report and retrofit plans in 14 days.
Oakland’s Mandatory Soft Story Retrofit Program (OMC Chapter 15.27) requires owners of pre-1991 wood-frame buildings with five or more units and a vulnerable target story to evaluate, permit, and retrofit. The final Tier 3 deadline was February 21, 2025. We prepare the TB15.27-2 report for your Initial Affidavit and carry the same building through retrofit design and permit submission.
Written scope and fee within one business day.

- 14 daysReport and retrofit plans
- 2 roundsPlan check corrections included
Wood-frame, five or more units, permitted before 1991.
The program applies to wood-frame residential buildings with five or more dwelling units, for which the building permit was applied for before January 1, 1991, that have a vulnerable target story: a ground story that is soft, weak, or open-front because of tuck-under parking, storefront glazing, or large openings with too little shear wall.
The City notified owners on its List and Map of Potential Soft Story Buildings in 2019 and assigned each building a tier. Tier 1 covers buildings of 20 or more units (Tier 1-LB) and buildings whose owners did not comply with the 2009 screening program (Tier 1-NR). Tier 2 covers 5 to 19 units. Tier 3 covers buildings where the target story contains residential or occupied commercial space.
All three tiers are past due.
Each date below is the final deadline: retrofit complete, final inspection approved, Final Affidavit filed. The interim evaluation and permit deadlines for every tier have also passed.
5 to 19 units
Residential or commercial space in the target story
Never filed Step 3? Then the building is further behind than the final date suggests. The Step 3 evaluation report and Initial Affidavit are the way back into the program, and that is where we start.
Extensions are reviewed case by case through the City’s extension request process. A completed Step 3 report and a permit application already in plan check are the strongest support for a request.
Oakland’s five steps, as the City names them.
H2 Seismic Pro performs Steps 3 and 4. Steps 1 and 2 are optional petitions; Step 5 is construction by your contractor.
- Step 1
Document that the building is not a subject building
Optional petition for exemption, signed by a licensed architect or engineer. Applies when the building does not meet the program criteria.
- Step 2
Document that the building is eligible for a later compliance tier
Optional petition to change tier, for example to Tier 3 when the target story contains residential or occupied commercial space.
- Step 3
Perform mandatory evaluation and submit Initial Affidavit of Compliance
Seismic Evaluation and Soft Story Retrofit Report per TB15.27-2, prepared by a licensed engineer. The owner then files the Initial Affidavit.
H2 delivers - Step 4
Obtain retrofit permit or submit Target Story Evaluation Report
Retrofit drawings and calculations submitted to Building Services, or an evaluation report showing the target story complies without strengthening.
H2 delivers - Step 5
Perform retrofit work, obtain final inspection, submit Final Affidavit
Your contractor builds to the permitted set. After final inspection, the owner files the Final Affidavit of Compliance.
The Seismic Evaluation and Soft Story Retrofit Report.
Step 3 is governed by Technical Bulletin TB15.27-1 (Engineering Requirements for Complying with OMC Chapter 15.27), Part B, and the report follows the City’s TB15.27-2 Evaluation and Schematic Retrofit Report template. A licensed engineer evaluates the target story and prepares a schematic retrofit concept. After the owner receives and reviews the report, the owner files the Initial Affidavit of Compliance.
Oakland is unusual in one respect: the report must also evaluate non-structural hazards, including gas lines and appliance connections, chimneys, and masonry partitions and veneer. Many competing proposals leave this out or price it as an add-on. In our scope it is included, because the City requires it.
Mitigating those non-structural items is voluntary. The report tells you which are cheap to fix while the contractor is already on site.
The Target Story Evaluation Report path.
Some Oakland buildings on the City list already have enough wall, or were strengthened decades ago without a clear record. For those, Step 4 does not require new construction. The engineer prepares a Target Story Evaluation Report demonstrating by analysis that the target story meets the engineering criteria as built, and it is submitted in lieu of a retrofit permit.
We tell you which path applies after the site visit and before the Step 3 report is final, so you do not pay for drawings you do not need.
Choose the step you need now.
Both options are fixed-fee and scoped in writing before work begins. Option A can be extended to Option B at any time without repeating work.
TB15.27-2 Evaluation Report
For owners who need the report on file and the Initial Affidavit submitted before deciding on retrofit timing.
- Site visit and target story evaluation
- Non-structural hazard evaluation: gas lines, chimneys, masonry partitions
- Schematic retrofit concept
- TB15.27-2 report, PE-signed
- Initial Affidavit of Compliance prepared for owner signature
Full retrofit design through permit submission
For owners who want one firm from the evaluation through an approved permit set.
- Everything in Option A
- Retrofit drawings and calculations per IEBC Appendix Chapter A4 or ASCE 41
- Or a Target Story Evaluation Report where no strengthening is required
- Submission to Oakland Building Services
- Two rounds of plan check corrections
Fixed fee, confirmed in writing before work begins. No hourly billing and no added charge for plan check responses.
What you receive, in the City’s vocabulary.
- TB15.27-2 Seismic Evaluation and Schematic Retrofit Report, PE-signed, including the non-structural hazard evaluation
- Initial Affidavit of Compliance support: affidavit prepared for owner signature and submitted on request
- Retrofit drawings and calculations per IEBC Appendix Chapter A4 or ASCE 41, stamped by a California PE
- Submission to Oakland Building Services through the City’s permit portal
- Two rounds of plan check corrections, answered by the engineer of record
Not included: construction, contractor bidding, City permit and plan check fees, special inspection and testing, geotechnical investigation, and hazardous materials surveys. After permit approval, your contractor performs the work, the City performs final inspection, and you file the Final Affidavit of Compliance.
Fourteen days from site visit to stamped set.
Turnaround runs from the site visit. Plan check time at the City is outside our control; correction responses are not.
- Day 1
Intake and records
Permit history pulled, City tier confirmed, existing drawings reviewed if any.
- Scheduled at engagement
Site visit
Target story measured, framing and foundation observed, non-structural hazards documented.
- Day 7
TB15.27-2 report issued
Report signed and delivered with the Initial Affidavit prepared for your signature.
- Day 14
Stamped retrofit set
Drawings and calculations submitted to Building Services. Two rounds of corrections included.
Common questions.
Every Oakland tier deadline has passed. What do I do now?
Who files the Initial Affidavit of Compliance?
What if my building already meets the standard without strengthening?
Are the gas line, chimney, and masonry findings mandatory to fix?
Who may prepare the report and stamp the drawings?
Do I need the original drawings?
Send the address and your tier. Get a written scope.
Every request is reviewed by a licensed PE. Include the tier on your City notice if you have it.
- Response
- Written scope and fee within one business day.
- Turnaround
- TB15.27-2 report and retrofit plans in 14 days from site visit.
- Fee
- Fixed fee, confirmed in writing before work begins. No hourly billing and no added charge for plan check responses.