H2 Seismic Pro
LA Ordinance 183893 · Mandatory Compliance

Your Non-Ductile Concrete Building has a compliance deadline.
We help you meet it.

PE-stamped structural evaluations and retrofit engineering for LA Ordinance 183893 — from Phase 1 checklist through permitted retrofit plans.

Serving all LA City and LA County jurisdictions · LADBS Non-Ductile Concrete Retrofit Unit experience

Mid-century pre-1977 non-ductile concrete office building in Los Angeles with exposed concrete frame and ribbon windows — the building type subject to LA Ordinance 183893 mandatory retrofit.
Pre-1977 Concrete · Ord. 183893 scope
Los Angeles, CA
Compliance Timeline

Where does your building stand?

  1. 1
    Year 0

    Order to Comply Received

    LADBS serves written notice by certified mail to the property owner of record. Most orders were issued 2016–2018.

  2. 2
    Year 3

    NDC Checklist Due

    Submit completed checklist confirming whether your building qualifies as non-ductile concrete. Deadline has lapsed for most buildings notified before 2022.

  3. 3
    Year 10 · THIS DEADLINE

    Structural Analysis + Plans Due

    Submit proof of previous retrofit, a complete structural analysis per ASCE 41-23, or plans to retrofit or demolish. 2026–2028 for most notified buildings.

  4. 4
    Year 25

    Construction Complete

    Permit obtained and construction completed, or building demolished.

  5. 5
    Final

    Certificate of Compliance

    Final close-out with LADBS. Building removed from non-compliant list.

If you have not submitted your structural analysis, your Year 10 deadline may be within 12–24 months. Engineering takes 4–6 months minimum. Start now.

The Ordinance

What Ordinance 183893 actually requires.

Los Angeles Ordinance 183893, passed in 2015, mandates seismic strengthening of concrete buildings constructed before January 13, 1977.

The ordinance applies to buildings where concrete walls or columns support floors or roofs — regardless of whether LADBS has formally identified your building.

If your building was permitted before that date, you may be subject to the ordinance whether you have received a notice or not.

You Are Subject If
  • Concrete building with permit application submitted before January 13, 1977.
  • Floors or roof are supported by concrete walls or columns.
  • Building has not been previously retrofitted under an approved program.
You May Be Exempt If
  • Building was permitted on or after January 13, 1977.
  • Detached single-family dwelling or detached duplex.
  • Previously retrofitted under Chapter 85 or former Chapter 95 of the LABC with documentation on file.

Not sure if your building qualifies? We review your permit history and building characteristics as part of every Phase 1 engagement.

Our Services

Three phases. Plain pricing.

Every NDC engagement runs through the same engineering desk. You always know which phase you’re in, what’s in the deliverable, and when LADBS receives the submittal.

Phase 01
First Step

NDC Checklist + Preliminary Report

$3,500+
Starting fee · 3–4 weeks from site visit
  • Site visit and building walk-through
  • Review of as-built plans and permit records
  • Completion of LADBS NDC Building Checklist form
  • Preliminary engineering determination
  • Formal LADBS submission with PE signature
  • Written preliminary report
Best for

Owners who have received an Order to Comply. Required first step for all affected buildings.

Phase 02
Year 10 Submittal

Structural Analysis Report

$18k–$60k+
Scope-dependent · 4–6 months
  • Material testing coordination (cores, rebar investigation)
  • Seismic evaluation per ASCE 41-23, Tier 3
  • Deficiency documentation per LABC §9508
  • Performance-based analysis: BSE-1E, BSE-2E hazard levels
  • Comprehensive report for LADBS submission
  • Preliminary retrofit strategy recommendations
Best for

Buildings confirmed non-ductile after Phase 1. Required to meet the Year 10 milestone.

Phase 03

Retrofit Design + Permit Set

By proposal
3–5 months after Phase 2
  • Retrofit system design (shear walls / steel moment frames / combined)
  • Complete construction drawings and calculations
  • LADBS permit submittal package
  • One round of plan check comment responses included
  • Construction administration support available
Best for

Buildings where Phase 2 confirms deficiency and retrofit is the chosen compliance path.

All three phases can be contracted together at a reduced combined fee. Ask about bundled pricing.

Why Owners Delay

The three reasons buildings stay non-compliant — and what each one costs you.

Reason 01

“I don’t know where I stand.”

Many owners received an Order to Comply years ago and have not tracked their deadline milestones. LADBS enforcement actions, fines, and liens can follow non-compliance. A Phase 1 review gives you a clear answer in 3–4 weeks.

Reason 02

“I don’t know what it will cost.”

Fee uncertainty is the most common reason owners delay. We provide a written Phase 1 scope and fixed fee before you commit to anything. No ambiguity about what the first step costs.

Reason 03

“I don’t know who to trust.”

The engineering firm you choose files the report under their PE license. That report becomes part of your building’s permanent LADBS record. You need a firm that knows the ordinance, the submission process, and ASCE 41-23 — not a generalist working off outdated code.

Technical Foundation

Built on ASCE 41-23 and the current LABC.

Los Angeles’s structural design guidelines for non-ductile concrete retrofit, updated through Information Bulletin IB-P-BC-2020-152 and referencing the 2026 Los Angeles Existing Building Code, require analysis under ASCE 41-23 Tier 3 using the BSE-1E and BSE-2E seismic hazard levels.

Material properties must be established through testing — concrete cores, rebar investigation, and soil data — before any analytical model is valid.

We build our evaluation workflow around these requirements from the start, which means fewer LADBS corrections and a faster path to your Certificate of Compliance.

Firms still working off ASCE 41-17 or earlier code cycles may produce reports that require revision before the city will accept them.

  • Analysis
    ASCE 41-23 Tier 3
  • Code
    LABC Ch. 95 / Ord 183893
  • Submittal
    LADBS NDC Unit
  • License
    California PE-Licensed
FAQ

Questions owners ask before Phase 1.

How do I know if my building is subject to Ordinance 183893?

Any concrete building — where floors or roof are supported by concrete walls or columns — with a permit application submitted before January 13, 1977 is subject, whether or not LADBS has formally notified you. You can check your building’s permit history in the LADBS Property Activity Report online, or we can review it as part of a Phase 1 engagement.

I received an Order to Comply years ago and never responded. Am I in violation?

Likely yes if you have not submitted the NDC Checklist. The 3-year checklist deadline has lapsed for most buildings notified before 2022. However, the most consequential deadline — the 10-year structural analysis and plans submission — is still approaching for most owners. Engaging an engineer now is the correct next step regardless of prior delays.

Can my building be found exempt after Phase 1?

Yes. Phase 1 may determine that your building does not meet the technical definition of non-ductile concrete under the ordinance, or that a prior retrofit qualifies as compliant. If exempt, LADBS closes your file and no further action is required.

What retrofit systems are typically used?

The most common approaches are adding new reinforced concrete shear walls, steel braced frames, or steel moment frames — systems that provide the ductility and lateral strength the original structure lacks. The specific system is determined by the Phase 2 analysis based on the building’s geometry, existing structural system, and owner objectives.

How much does a full retrofit cost to construct?

Construction costs are typically $50 to $100 per square foot of building area, depending on building height, structural system, and site conditions. Engineering and permitting fees add approximately 10–20% on top of construction cost. We provide preliminary cost estimates as part of Phase 2 deliverables.

Can you work with my property manager or attorney?

Yes. We routinely coordinate with property managers, ownership attorneys, and general contractors throughout the process. If you prefer, all communications can route through a designated representative.

Phase 1 Intake

Find out where your building stands.

Fill out the form below and we will respond within one business day with your building’s ordinance status and a Phase 1 scope and fee.

Office
Dublin, CA 94568
Hours
Mon–Fri · 8am–5pm PT
Response
Within one business day

We respond within 1 business day. No commitment required to receive a proposal.